RESUME
RAKESH M .S
Bangalore
Mobile: 98868686868
Email: rakeshms@rediffmailer.com
Objective:
A career with a progressive organization that will use my knowledge, education, skills and decision-making ability and hence increase my experience with developing association.
Experience Summary:
Five Years of Professional Experience in Oil & Gas projects as a piping engineer worked in UAE, Qatar, INDIA in areas of fabrication, erection and testing of piping. Well Experience in piping related drawings like isometric, P& ID, Plan, plant smart viewer (3D) ,Certification in Level-II Also experiences in all mechanical related drawings. Well experienced in dossiers like preparation of test pack, As built control sheet, welding summery.Also very well experienced in revising isometrics and P&ID.Familiar with codes and standards like ASME standards.
Work Experience:
Position : Sr.Piping Engineer
Organization : Mechlac Construction Co LLC,Dubai
Duration : Jan 2009 to till date
Job responsibilities:
Work Experience:
Position : Sr.Piping Engineer
Organization : Mechlac Construction Co LLC,Dubai
Duration : Jan 2009 to till date
Job responsibilities:
Verification of isometric drawing with respect to P&ID.
Preparation of red lines (mark-up) on drawings during construction and submitting to the end user (proponent) for approval, prior to make the final as-built drawings.
Reviewing the spool Releasing check sheet and sending to sites after approving.
Shop floor inspection and testing of fabrication pipes.
Witness of alignment, orientation and dimensions of installed piping
Preparing the punch list items as per P&ID and Isometric such as, Pipe supports, Valves, Guides, Shoe supports and NDT completion and approving/ releasing packages for hydro test.
Checking joint fit-up & Monitoring and ensuring that the appropriate consumables being distributed to welders in order to make a sound weld.
Witnessing of pneumatic test, hydro-test, and flushing; system lay-up both in erection field.
Reviewing final Packages for Hydro tests, approving & releasing for Hydro test.
Assures that all joints are exposed for examination during the pressure test.
Conform repairs, re-testing and re-inspection in accordance with specifications.
Making a re-instatement punch list and clearing the items.
Witnessing of Flange joint assembly and bolt torque.
Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest drawing for construction, codes and specification standards.
Preparing and maintaining various QA/QC documents and final test packages.
Clearing of MCC (Mechanical completion certificate) items.
Reviewing the approved quality plans, manuals and scope of work to perform the required inspection.
Position : Piping Engineer
Organization : Offshore Piping Co LLC,Qatar
Duration : Jan 2006 to Oct 2008
Job responsibilities:
Fabrication, erection, inspection, testing of various piping systems related to refinery as per isometrics and GA drawings.
Ensure the completion of shop fabrication on time as per given schedule work schedule
Assign to pipe fabrication shop to monitor and supervise the inspectors’ quality activities to ensure compliance to the relevant inspection and test plan.
Check that all project documents that are maintained in the pipe shop are the latest revision before commencement of work. Continuously check and review the changes status during the work.
Coordinate inspection activities discuss and resolve where possible problems relating to quality with the company.
Prepare Erection schedule in consultation with clients and review the quality of erection & reviewing the piping work as per client procedure and project specification.
Review Engineering package, piping design and drawing, piping layout, detailed inspection and construction work ,perform all material takeoff(Mechanical , piping components, supports ,insulation and coatings ).
Identify discrepancies between actual material requirement for fabrication and client supplied material.
Develop a test package for piping and coordinate with clients to prepare Above ground piping Test Package.
Planning of erection sequence as per site conditions & Mechanical inspection of the system as per P & ID.
Preparation of weld map for Site condition.
Pipe cut length calculations & Detailing the pipeline with all the fittings.
Revision control of Isometric piping drawings from Piping G.A & P & ID. Advise SWN (stop work notice), coordinating with Spool Gen, Auto cad and back check team.
Ability to do mark ups & resolving tasks for SWN, S.C.R (shop change requirements), F.C.R (field change requirements), drawings as per the site requirement accordingly release to shop.
Assist in preparation of test packages for Pneumatic tests and Hydrostatic tests and line check.
Updating Internal Database with all information’s like NCR, Surveillance reports.
Position : Piping Engineer
Organization : CMC CO LTD,Mumbai
Duration : Oct 2003 to Dec 2005
Job Responsibilities
Marking of TEST BLOCK MARK-UP P & ID as per system and subsystem.
Prepare pressure Test Package for piping system for testing purposes.
Preparation of Punch list for the Piping TEST PACK and Mechanical Clearance of the same.
Coordinating with Sub Contractor for Liquidation of the Punch list and confirming the same.
Able to generate piping and isometric drawings construction, fabrication and erecting.
Able to solve construction problems and difficulties arising due to discrepancies in design or material in compatibility
Preparation of AS BUILT drawings as per site modification and approval for the same from Engineering.
Conducting the subcontractor test pack meeting for the expedition of the priority system.
Responsible in verification of all materials for plant drawings before it will release for construction.
Responsible in assuring all the pipe line systems in accordance to its specifications, correct routing of the pipe according to its isometric drawings & P&ID’s and all structural supports for all pipeline system packages.
Checking the correct orientation of pipe spools, fittings and correct materials to be used as stated in the design data.
Prepared as built drawings for modification and obstructed pipe spools.
Involved in the preparation of work packages, job cards, and work schedules.
Preparation of pipe spool drawings for shop fabrication and field erection works, indicating shop weld and field weld limits.
Educational Qualifications:
Reviewing the spool Releasing check sheet and sending to sites after approving.
Shop floor inspection and testing of fabrication pipes.
Witness of alignment, orientation and dimensions of installed piping
Preparing the punch list items as per P&ID and Isometric such as, Pipe supports, Valves, Guides, Shoe supports and NDT completion and approving/ releasing packages for hydro test.
Checking joint fit-up & Monitoring and ensuring that the appropriate consumables being distributed to welders in order to make a sound weld.
Witnessing of pneumatic test, hydro-test, and flushing; system lay-up both in erection field.
Reviewing final Packages for Hydro tests, approving & releasing for Hydro test.
Assures that all joints are exposed for examination during the pressure test.
Conform repairs, re-testing and re-inspection in accordance with specifications.
Making a re-instatement punch list and clearing the items.
Witnessing of Flange joint assembly and bolt torque.
Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest drawing for construction, codes and specification standards.
Preparing and maintaining various QA/QC documents and final test packages.
Clearing of MCC (Mechanical completion certificate) items.
Reviewing the approved quality plans, manuals and scope of work to perform the required inspection.
Position : Piping Engineer
Organization : Offshore Piping Co LLC,Qatar
Duration : Jan 2006 to Oct 2008
Job responsibilities:
Fabrication, erection, inspection, testing of various piping systems related to refinery as per isometrics and GA drawings.
Ensure the completion of shop fabrication on time as per given schedule work schedule
Assign to pipe fabrication shop to monitor and supervise the inspectors’ quality activities to ensure compliance to the relevant inspection and test plan.
Check that all project documents that are maintained in the pipe shop are the latest revision before commencement of work. Continuously check and review the changes status during the work.
Coordinate inspection activities discuss and resolve where possible problems relating to quality with the company.
Prepare Erection schedule in consultation with clients and review the quality of erection & reviewing the piping work as per client procedure and project specification.
Review Engineering package, piping design and drawing, piping layout, detailed inspection and construction work ,perform all material takeoff(Mechanical , piping components, supports ,insulation and coatings ).
Identify discrepancies between actual material requirement for fabrication and client supplied material.
Develop a test package for piping and coordinate with clients to prepare Above ground piping Test Package.
Planning of erection sequence as per site conditions & Mechanical inspection of the system as per P & ID.
Preparation of weld map for Site condition.
Pipe cut length calculations & Detailing the pipeline with all the fittings.
Revision control of Isometric piping drawings from Piping G.A & P & ID. Advise SWN (stop work notice), coordinating with Spool Gen, Auto cad and back check team.
Ability to do mark ups & resolving tasks for SWN, S.C.R (shop change requirements), F.C.R (field change requirements), drawings as per the site requirement accordingly release to shop.
Assist in preparation of test packages for Pneumatic tests and Hydrostatic tests and line check.
Updating Internal Database with all information’s like NCR, Surveillance reports.
Position : Piping Engineer
Organization : CMC CO LTD,Mumbai
Duration : Oct 2003 to Dec 2005
Job Responsibilities
Marking of TEST BLOCK MARK-UP P & ID as per system and subsystem.
Prepare pressure Test Package for piping system for testing purposes.
Preparation of Punch list for the Piping TEST PACK and Mechanical Clearance of the same.
Coordinating with Sub Contractor for Liquidation of the Punch list and confirming the same.
Able to generate piping and isometric drawings construction, fabrication and erecting.
Able to solve construction problems and difficulties arising due to discrepancies in design or material in compatibility
Preparation of AS BUILT drawings as per site modification and approval for the same from Engineering.
Conducting the subcontractor test pack meeting for the expedition of the priority system.
Responsible in verification of all materials for plant drawings before it will release for construction.
Responsible in assuring all the pipe line systems in accordance to its specifications, correct routing of the pipe according to its isometric drawings & P&ID’s and all structural supports for all pipeline system packages.
Checking the correct orientation of pipe spools, fittings and correct materials to be used as stated in the design data.
Prepared as built drawings for modification and obstructed pipe spools.
Involved in the preparation of work packages, job cards, and work schedules.
Preparation of pipe spool drawings for shop fabrication and field erection works, indicating shop weld and field weld limits.
Educational Qualifications:
B.E (Mechanical Engineering from Bangalore University)
Other Qualifications:
Familiarity with Engg. Codes & Specs
ASME B.31.3, B.31.1,ASME-16.5 NACE Standard
ASME B.31.3, B.31.1,ASME-16.5 NACE Standard
Technical Qualification: NDT LEVEL II (as follows below)
1. Radiography Testing
2. Ultrasonic Testing
3. Dye Penetrating Testing
4. Magnetic Particle Testing
1. Radiography Testing
2. Ultrasonic Testing
3. Dye Penetrating Testing
4. Magnetic Particle Testing
Additional Skills:
Programming Languages : Basics of C
Packages : HYPERMESH
Modeling : Auto CAD, CATIA, NASTRAN.
Operating System : Windows 7/ 98/XP.
Programming Languages : Basics of C
Packages : HYPERMESH
Modeling : Auto CAD, CATIA, NASTRAN.
Operating System : Windows 7/ 98/XP.
PERSONAL DETAILS:-
Father’s Name :
Date of Birth :
Marital Status :
Languages Known :
Passport Details :
Passport No :
Date of Issue :
Date of Expiry :
DECLERATION-:
I hereby solemnly declare that all the information given above is true as per my knowledge & belief.
Date:
Place: (NAME)
0 comments:
Post a Comment