Union Public Service Commission invites Applications for the following Posts
WEBSITE:http://upsconline.nic.in/ora/candidate/VacancyNoticePub.php
LAST DATE:3-10-2013
Links....
RAMACHANDRAN
CHENNAI
Mobile: 988686868
Email:ram_chennai98@yahoo.com
Objective:
A career in Projects/ Operations with Petrochemical/ Energy sector that utilizes and enhances my Project Management skills, site experience and knowledge in Mechanical Engineering.
Profile:
Good knowledge in the fields of Mechanical engineering, Project management, startup & commissioning, welding technology, piping, fire-protection, international codes (ASTM, API, BIS), ISO 9001:2000, in-depth knowledge of OISD guidelines & Indian statutory regulations, Multi-disciplinary engineering knowledge, Production and Operations, Can work efficiently as a part of a team and as an individual, Possess good oral and written communication skills, excellent mathematical aptitude, self starter and result oriented.
Education:
— Bachelor of Engineering (Mechanical) From Chennai University in May' 1997.
— PG Diploma in Project Management.
— PG Diploma in Project Management.
Work Experience:
8 1/2 years in Bharath Construction Company Limited, Mumbai
Sr. Project Engineer/Project Manager (Aug 2009 — continuing)
Sr. Project Engineer/Project Manager (Aug 2009 — continuing)
Installation and Commissioning of 5 x 500 MT Mounded Storage Facility for LPG.
Project value: 8.0 Million US$.
Detailed estimation, Tender preparation, technical bid evaluations, statutory approvals, land development, work execution at site, overall supervision and monitoring cost, quality and schedule variances, change orders, man and material movement, co-ordination with third party consultants like PDIL, IRS etc., periodic progress reviews and minutes with contractors, & reporting to Head-office.
Sr. Operations Officer (Nov 2004– July 2009) at Indian LPG Bottling Plant,Mumbai
Plant throughput: 11000 MTPA, Turnover: 7.5 Million US$.
Overseeing entire LPG Filling operations, maintenance, Safety, Quality Control, Training programs, Payroll administration, Accounting, Product distribution planning& logistics, Capital & Non-planned Capital projects, pneumatic robotics for LPG plants.
Project Engineer: (Apr 2001 — Oct 2004): at Gulf Refinery, Dubai,U.A.E
Installation and commissioning of fully automatic LPG Cylinders filling machine, Electronic Leak detectors & other quality control , Chain Conveyor System, construction of various industrial facilities like buildings/ sheds/ roads/ drains etc., Capacity augmentation of a running LPG Bottling plant from 11000 MTPA to 22000 MTPA, Design, Installation & commissioning of automatic fire fighting system, gas monitoring system, LPG Vapor extraction system, LPG/ Water/ Air Pipeline and aboveground MS water tanks.
Project Engineer: (April 1999-March 2001) at Emirates Petroleum Company, Dubai , U.A.E
(Construction and commissioning of 11000 MTPA capacity LPG Bottling plant from grassroots)
Cost estimation, preparing purchase requisitions, tender document preparation with special terms and conditions, Technical specification writing and finalizing technical Bids, Risk analysis, Disaster Management Plan, Monitoring & control over schedule/cost variance, Multi-disciplinary technical support, P&I development and modifications, Resource & Contract management, Periodic Review and minutes with various contractors, commissioning and handling various safety, technical and financial audits, various statutory approvals, reporting to Head office, claim/ dispute settlements/arbitrations, final closure and report writing.
Project Engineer: (December 1997-March 1999) Mechlac Construction Company, Abu Dhabi, U.A.E
Land development, construction of civil structures, statutory approvals, Installation and commissioning of PLC based Automatic Fire Fighting system (auto sprinkler system) and associated piping work, Various LPG piping and fire proofing of LPG storage vessels,(Horton Sphere), Installation and commissioning of PC Based Gas Leakage Monitoring System, Design, fabrication, erection and commissioning of various electrical interlocking systems, transformers, ACBs & VCBs.
Computer Skills:
Project value: 8.0 Million US$.
Detailed estimation, Tender preparation, technical bid evaluations, statutory approvals, land development, work execution at site, overall supervision and monitoring cost, quality and schedule variances, change orders, man and material movement, co-ordination with third party consultants like PDIL, IRS etc., periodic progress reviews and minutes with contractors, & reporting to Head-office.
Sr. Operations Officer (Nov 2004– July 2009) at Indian LPG Bottling Plant,Mumbai
Plant throughput: 11000 MTPA, Turnover: 7.5 Million US$.
Overseeing entire LPG Filling operations, maintenance, Safety, Quality Control, Training programs, Payroll administration, Accounting, Product distribution planning& logistics, Capital & Non-planned Capital projects, pneumatic robotics for LPG plants.
Project Engineer: (Apr 2001 — Oct 2004): at Gulf Refinery, Dubai,U.A.E
Installation and commissioning of fully automatic LPG Cylinders filling machine, Electronic Leak detectors & other quality control , Chain Conveyor System, construction of various industrial facilities like buildings/ sheds/ roads/ drains etc., Capacity augmentation of a running LPG Bottling plant from 11000 MTPA to 22000 MTPA, Design, Installation & commissioning of automatic fire fighting system, gas monitoring system, LPG Vapor extraction system, LPG/ Water/ Air Pipeline and aboveground MS water tanks.
Project Engineer: (April 1999-March 2001) at Emirates Petroleum Company, Dubai , U.A.E
(Construction and commissioning of 11000 MTPA capacity LPG Bottling plant from grassroots)
Cost estimation, preparing purchase requisitions, tender document preparation with special terms and conditions, Technical specification writing and finalizing technical Bids, Risk analysis, Disaster Management Plan, Monitoring & control over schedule/cost variance, Multi-disciplinary technical support, P&I development and modifications, Resource & Contract management, Periodic Review and minutes with various contractors, commissioning and handling various safety, technical and financial audits, various statutory approvals, reporting to Head office, claim/ dispute settlements/arbitrations, final closure and report writing.
Project Engineer: (December 1997-March 1999) Mechlac Construction Company, Abu Dhabi, U.A.E
Land development, construction of civil structures, statutory approvals, Installation and commissioning of PLC based Automatic Fire Fighting system (auto sprinkler system) and associated piping work, Various LPG piping and fire proofing of LPG storage vessels,(Horton Sphere), Installation and commissioning of PC Based Gas Leakage Monitoring System, Design, fabrication, erection and commissioning of various electrical interlocking systems, transformers, ACBs & VCBs.
Computer Skills:
Office applications: MS Word, Excel, MS Access, Power point & FrontPage, Lotus Smart-Suit.
Operating Systems: Windows
Project Management Software: “PRIMAVERA PROJECT PLANNER (P3)"
Design Software: AutoCAD 14
ERP package: working with JDE
Personal Details:
Operating Systems: Windows
Project Management Software: “PRIMAVERA PROJECT PLANNER (P3)"
Design Software: AutoCAD 14
ERP package: working with JDE
Personal Details:
Father’s Name:
Date of Birth:
Passport No.:
Passport Issue Date:
Passport Validity:
Write and present reports
Write and present reports
SAMPLERESUMEONLINE TOP BLOG | TOTAL VIEWS | SAMPLERESUMEONLINE TOP BLOG | TOTAL VIEWS |
2447 | 2152 | ||
2447 | 2485 | ||
2919 | 2120 | ||
5727 | 2760 | ||
2173 | 2213 | ||
2878 | 2962 | ||
5103 | 3061 | ||
2727 | 2096 | ||
2715 | 2659 | ||
2641 | 3343 | ||
4388 | 2321 | ||
3550 | 3048 |
0 comments:
Post a Comment